The responsibilities of this role included:
• Cost estimation: Capex direct and indirect costs (labour, bulk materials & plant equipment, freight, construction equipment, contractor distributables and vendor representation).
• Planning and scheduling assistance.
• Procurement and contract administration.
Major project involvement included:
- Repsol YPF E&P Bolivia | Gran Chaco Plant EPC | USD 500mill | Bolivia (2011)
- YPF | Low-Sulfur Gasoil and Gasoline | USD 280mill | Argentina (2010)
- Repsol YPF E&P Bolivia | Rio Grande Plant EPC | USD 160mill | Bolivia (2010)
- Repsol YPF E&P Bolivia | Margarita Plant EPC | USD 500mill | Bolivia (2010)