I've Oracle Primavera P6 Professional R16.2
Project WBS contains 10 Major Items (Sites)
Contractor send update, I assign Baseline for compare Schd % against Perf %
the problem is, one of the sites' Performance % Complete Changes after I assign the Baseline, Only one !
the remaining sites and the overall Perf % is the same, no changes, has no problem.
I need to know what happened.