From Primavera P6 with love :-)

You can download the Project and the Layout from here : https://doduykhuong.com/2017/11/25/merry-christmas-from-primavera-p6/ [1]
From Primavera P6 with love :-)
You can download the Project and the Layout from here : https://doduykhuong.com/2017/11/25/merry-christmas-from-primavera-p6/ [1]
Links:
[1] https://doduykhuong.com/2017/11/25/merry-christmas-from-primavera-p6/