START Date:
July, 2013
END Date:
July, 2016 Construction planner for the surface infrastructure contract at the new Shondoni Coal Mine.
Construction planner for the surface infrastructure contract at the new Shondoni Coal Mine.
Links:
[1] http://www.planningplanet.com/category/company/aveng-grinaker-lta
[2] http://www.planningplanet.com/category/industry/civil-building-em
[3] http://www.planningplanet.com/category/project/mpumalanga
[4] http://www.planningplanet.com/taxonomy/term/13025
[5] http://www.planningplanet.com/category/project/shondoni-mine
[6] http://www.planningplanet.com/category/region/africa-af/south-africa-afza