I have project which consists of quite a large number of drawings.My cliet asked me to incorporate all drawings in the design and deliverables part of the project. Since i have to link all(majority of ) the drawing to construction part and each drawing will go for two or three revisions from client how do i link to the construction part .
In short :
1. I have drawings, some of them will undergo 2 reviews,some of them will have 3 or more .
2.In this situation how do we link the drawing to the construction
Thanks and regards,
Shijau