Hi friends, My MSP Schedule is matched with P6 schedule in terms of duration, Pre & Suc, leads & Lags, resources, calendar. Without leveling the resource, the both MSP and P6 is matched 100%. When enabling the level resource option in Both, P6 dates are not matching with MSP. I need P6 has to match with MSP. Because, MSP is finalized with client. I need to find which option to be enabled in P6 in order to keep the date matched with P6. I am breaking my head for past 2 weeks. Please give me a hint to resolve this. if require, I shall share the files to check the issues. My Mail Id: rajkumars2810@gmail.com [1]. Regards, Rajkumar