The Six-Point Checklist for NEC3 Programmes
By Roger Gibson
- Does the programme comply with the contractual obligations?
- Work activity durations and content
- Logic relationships/links
- Network constraints
- Scheduling criteria and results
- Critical path and near-critical paths