As a Planning Engineer
W Work included the production of Contract programme to client, target programme to internal team.
W Formatting, editing and issuing, updating progress, mitigation and correction of contract programme.
W Issuing, mitigating, recovery and progress mark-ups of construction programmes which delicates the criteria for work progress in the project
W Issue of KPI’s(Manpower, Productivity, Quantity, Pictorial and Graphical reports) periodically for internal purpose and for Client requirements
W Analyse key performance indicators (KPI) and identify deviations and potential risks, develop and maintain Earned Value Project control reports and curves.
As a Project Engineer
W Structural completionof a 14 storey twin linear tower and an 10 storey linear tower in 8 months
W Involved in starting the initial works for most of the finishing packages viz, Block work, Dry lining, Facades, Cladding, Structural Steel works, Tiling, Joinery works, MEP, External Insulation & Render.
W Detailed planning and logistics management of all stages of construction including material procurement.
W Study of drawings & coordinating with various trades of construction.
W Analysis and optimizationof resource usage by conducting productivity studies.
W Preparing weekly & daily programme and progress reports.
W Co-ordination and monitoring the Sub-contractorsfor the progress of work against the programme and creating short range schedules for the completion of their work.