Providing a pivotal role in the safe execution of activities offshore, maximising facility resource utilisation while minimising impact to production on Woodside’s flagship offshore Platform. Key deliverables:
Plan SIMOPS with DSV supporting diving activities for subsea tie-ins for second trunk line (TSEP) project
Integrate activity schedules input from Alliance Projects, Offshore Maintenance, Integrated Shutdown, Campaign Maintenance and Production Planners to produce a 120 day operational platform activity plan within concurrent activity and logistic constraints
Minimise concurrent work front conflicts during drilling campaign (Perseus 1B), major brownfield modifications (NRA Life Extension) and operation modes
Manage logistic constraints of platform (Personnel on Board (POB), Helicopter Flights, Support Vessels)
Based on business goals identified in the venture business plan assist stakeholders with tactical planning of major activities in the 2 year planning window