All of my original durations are changing after importing a baseline made on P6 v8.3, I am using P6 v6.0. The XER was converted to 6.0 before being imported. This is causing a massive problem for me and I am unable to find a solution.
All of my original durations are changing after importing a baseline made on P6 v8.3, I am using P6 v6.0. The XER was converted to 6.0 before being imported. This is causing a massive problem for me and I am unable to find a solution.