Hi,
I need to run a time distributed planned value pull from my programme. I have done these many times in the past albeit, a long time ago. I tried to run the report against activities then the WBS (in the report wizard) but each time, the report returned a nill value.
Appreciate guidance with this issue.
Thanks
Simon