I need the sequence of work and relationship for the following Electrical activities
Embedded Conduiting in the Floor Slab |
Conduiting in Blockworks |
Installation of Trunking |
Install Cable Tray |
Wiring for Lighting |
Wiring for Power |
Wiring for Fire Alarm |
Wiring for Emergency Lighting System |
Dressing & Termination of Fire Alarm |
Wiring for IP CCTV |
Dressing & Termination of Emergency Lighting |
Wiring for SMATV System |
Dressing & Termination of SMATV |
Wiring for Structured Cabling |
Wirng for BMS |
Dressing & Termination of Structured Cabling |
Dressing & Termination of BMS |
Dressing & Termination of CCTV |
Uninteruptable Power Supply (UPS) |
Central Battery System |
Installation of BMS |
Thanks in advance