Hi guys,
Im badly in need of your help.
Can anyone give me anidea for the detailed sequence of work in construction of spillway.
it is 4-bay gated spillway. The length of spillway is 66.9m, height from the bottom of foundation is 32.0 meters, the width of the foundation is 46.4 meters. Distance between each other is 12.6 meters, and the width of the pier is 3.5 meters..
your quick response is appreciated...
thanks,
eric