May, 2013 Looked over the general layout of Habshan-5 project.
Received training and experience in pipe spooling method, test pack preparation and as built.
Looked over the work procedure in Material Control, Procurement, Cost Control departments and a more detailed training over standards and work flow in QA/QC department.
Learned and gained a practical experience in the monitoring & progress calculation, basis of scheduling and progress measurement steps.
Received training on safety including HSE induction, confined spare, job observation report and work permit course.