Project Director Project Support [1]
Metroselskabet I/S [2]
Copenhagen City Circle Line, is under-construction and scheduled to open in 2018. The line will be 15.5 km long and run entirely in tunnel. The circle will have 17
stations and is estimated to cost 22.3 B DKK (3.8 B USD)