I m working with a schedule wich is without cost & loaded
my duration % complete = 12.33 & my schedule % complete = 40% Keeping in view above percentage i would like to show curves on the basis of duration. thanks in advanceI m working with a schedule wich is without cost & loaded
my duration % complete = 12.33 & my schedule % complete = 40% Keeping in view above percentage i would like to show curves on the basis of duration. thanks in advanceLinks: