CAREER OBJECTIVE:
My objective is to work for a dynamic organization and fetch fruitful results, which I believe alone, would steer my career prospects.
WORK ARENA
Civil engineer with 12(+) years experience in planning, Billing and execution of Metro Project, Cast in Situ and Precast Segmental Bridges, Piling etc. Well conversant in execution, Planning, resource management, Project scheduling and updating, Rolling Program making, Base Program making, Budgeting, client billing etc while working with a cohesive team of multi-disciplinary professionals.
PERSONAL STRENGTH:
1) Have experience in planning by the use of Primavera Project Management latest version (P6)
And Whole Project Billing as a Quantity Surveyor
2) Competent to carry out execution as well as management works for a site individually.
3) Punctuality with time and work.
4) Client liassioning with perfection.
5) Subordinate development capabilities by continuous self and team product improvement both qualitative and quantitative wise.
6) Recent past experiences in Marine works, Bridges and Interchanges, Metro Rails etc.
AREAS OF EXPERTISE
Site Works All activities in Bridge Construction. | Office Works Have experience as a kea Planner by the use of P6. |
Have experience to handle the site individually. Metro works, Station building works,Marine works, Piling works etc | Management and Planning skill. Client Billing, Co-ordinate with Client, Rate analysis, Claim |
Formwork with DOKA materials. |
|
WORKING EXPERIENCE:
1) In Mumbai Metro Rail Project.
Organization: Sew Infrastructure Ltd
Consultant: PB - Systra JV
Client: Mumbai metro one private ltd (Reliance)
Designation: Manager
Duration: From June’ 2008 to as on date.
Structure: 12 stations with various typical type and one Extra dosed and two Cantilever Bridge.
Project Value: INR 350 CR.
Experiences:
Ø Planning, scheduling, Updating, Rolling Program & Base Program making etc. for whole project by the use of Primavera Project Management latest version(P6)
Ø Individually handling the Site with proper safety arrangement.
Ø Main project Billing with Client, Rate analysis, Escalation etc
Ø Manpower arrangement, Proper planning and scheduling the project and day to day updating that one, coordinating with client , shift arrangement etc.
2) In Dubai Rapid Link Consortium ( DURL) in Metro Rail Project.
Organization: Obayashi Corporation (TOKYO) in Japan and Turkey JV in the construction of Dubai Metro Rail Project.
Engineer’s: SYSTRA-PARSONS JV
Designation: Chief Engineer.
Duration: From January’2007 to May’ 2008.
Structure: In Substructure construction of Elevated Viaduct of a 5 km stretch.
Project Value: US $ 3.4 Billion.
Experiences:
Ø Individually handling one (5 km) site for Viaduct sub structure.
Ø Day to day Programming, Planning, scheduling by the use of Primavera Project Management software.
Ø Utility diversion by the use of Utility Drg.
Ø Resource management, Cost controlling etc.
Ø Maintaining the safety policy at site.
Ø Piling work up to 2200 diameter and sheet pile, cast in situ pile etc.
Ø Execution of pile cap, pier, pier cap construction as per the construction drawings.
Ø Execution the work without damaging the utility by utility protection and diversion.
Ø Execution of work by Traffic diversion drawing.
3) In BANDRA-WORLI SEA link project:
Organization: In Hindustan Construction Company Ltd. (HCC)
Engineer’s: Dar Al-Handasah.
Designation: Civil Senior Engineer.
Duration: From September 2000 to December’2006
Structure Substructure & superstructure construction of Cable stayed segmental Bridge of 5.5 Km long in offshore where have 126 meter high PYLON.
Project Value: INR 1600 CR.
Experiences:
Ø Execution of Cable Stayed Bridge and any type of heavy structure.
Ø Execution of typical type of PYLON works as per the construction drawings.
Ø Pile Driving up to 2000 mm diameter in offshore andCofferdams making.
Ø Tremie seal, pile cap, pier, pier cap construction.
Ø Segment Launching by Launching girder.
Ø Client Liassioning, preparation of Subcontractor billing.
Ø Making program and planning of day-to-day activities and was responsibility to achieve the targets.
Ø Maintaining the International Health & Safety Standard.
SOFTWARE PROFICIENCIES:
Know thePRIMAVERA PROJECT MANAGEMENT LATEST VERSION (P6) and MS Windows based application software MS-OFFICE which includes: MS-EXCEL, MS WORD, MS POWERPOINT and can work the necessary documentation works using those software’s.
EDUCATIONAL QUALIFICATION:
Exam Passed Passing year Board/Council Percentage
SSC (10th standard) 1993 W.B.B.S.E 52.78
HSC (10+2 standard) 1996 W.B.B.H.S.E 40.5
Diploma in CIVIL Engg. 2000 W.B.B.T.E 76.4
Diploma in Construction Management. 2004 ANNAMALAI 66.5
OTHERS INFORMATION:
Fathers Name: Shri Ratan Moni Roy
Date of birth: 10th June’ 1977
Place of Birth: Burdwan, West Bengal.
Nationality: INDIAN.
Religion: Hinduism.
Languages Known: English, Hindi & Bengali
Marrital Status: Single.
PRESENT EMOLUMENTS:
Around INR 100000/ per month including all the Overtimes plus the followings:
a) Free conveyance facilities.
b) Well furnished family accommodation
c) Yearly leave as per the rule.
EXPECTED EMOLUMENTS: Negotiable with the organization.
I solemnly believe that the information given above is true to the best of my knowledge and I will provide documentation whenever required.