Hi
i have run into a new problem. I created a project with project activity codes(P6.2) . now i want to use the same codes for other projects in the same eps, so i tried to conver them to the EPS codes.
As soon as a project activity codes are converted to EPS codes, i loose their existing allocation in the project and my project becomes void of codes allocation.
is there any way around it?
Regards