The issue is 2 default calendars are ticked. If I try to untick one the message we get is {One default value is required.} If we try to assign another calendar as default the event code 2DVWV-3590-8 occurs. has any one experienced this?
The issue is 2 default calendars are ticked. If I try to untick one the message we get is {One default value is required.} If we try to assign another calendar as default the event code 2DVWV-3590-8 occurs. has any one experienced this?
Links:
[1] http://www.planningplanet.com/forums/oracle-primavera-pm6