Hi Planners,
After resource leveling the schedule, is there a quick way to transform the results into the schedule as logic (links).
I dont want to Level the schedule every time; once happy with results I'd rather to keep them.
Cheers
Hi Planners,
After resource leveling the schedule, is there a quick way to transform the results into the schedule as logic (links).
I dont want to Level the schedule every time; once happy with results I'd rather to keep them.
Cheers