1- B.SC Civil Engineering 2001.
2- Certified"Master Project Management"(MPM).
3- "PMP" certified Preparing Course from "TMA
Institute".
4- Capable of sitting projects methodology.
5- Familiar with management papers like: project
Charter, business case, statement of work, risk
Plan, quality plan, schedule plan ….etc).
6- Apple to prepare & Administrate contracts and
Solve its disputes.
7- Certified "international computer driving license"(ICDL).
8- Counselor arbitrator."محكم دولى معتمد"
Professional member:
- Project management institute "PMI".
- Egypt Engineers syndicate "EES".
- Management Engineering society "MES".
- American Academy of project management "AAPM".
- Canal arbitration center "CAC".
- Some project management communities like:
· PM world today journal.
· PM podcast.
- Some project management mailing groups like:
· Ten step.
· 123 method.
The PM student.
RELEVANT EXPERIENCES:
◊ Projects Planning and Control duties:
• I have a wide academic back ground about project planning and schedule technique based on C.P.M. and PERT.
• Framing E.P.S, O.B.S, W.B.S, C.B.S and activity code structure based on scope of work, method of statement and contract document.
• Generation of master and detailed schedule plan using Primavera P6 software .
• Make the project schedule tracking layouts, reports and updating.
• Optimizing the schedule and analyzing the project status.
• Prepare the company integrated master schedule for the expected projects to plan for:
a. Prepare the time schedule for each project.
c. Estimate the required resources versus the available.
d. Prepare the procurement plan for the project.
• Prepare the project schedule considering the client milestones.
• Review the subcontractors schedule to be matching with the project milestones.
|
• Prepare Project Control System to measure the project progress and prepare the Earned Value Analysis indices to identify the project schedule and cost status.
• Prepare the daily, weekly, monthly work progress reports and S-curve according to the control spread sheets (based on relative weight %).
• Prepare the Look Ahead Schedule for construction.
• Follow up and highly tracking to the project at overall stages and record the dates, durations, productivity, earned value, updating the project schedule, determine and analyze the variance between the target plan and the actual.
• Prepare the delay analysis report and the recommended corrective active shall take to avoid be behind the schedule.
• Prepare the revised version of schedule program to meet any variations during the construction phase or meet new client milestones (Crashing or Fast Tracking techniques).
• Issue all previous documents that produced periodically to the project stockholders (according to issues distribution list).
• Estimate the future demand of row material, tools, manpower and equipment based on our construction plan (Resources availability against Resource histograms).
• Negotiate with client (usually foreign clients) about any deviation between contractual conditions and actual conditions for execution CLAIMS.
• Assist the project manager in the decision-making at related field.