START Date:
May, 2008
END Date:
August, 2009 Establish the revised overall EPC schedule in P3 with client approval for base lining.
Update and maintain the EPC master schedule. Generate 3 week and 90 days look-ahead construction schedule for weekly and monthly project contractual submission..
Gather offshore engineering and procurement progress data for roll up into the master schedule.
Coordinate with discipline engineers and procurement coordinators on matters related to schedule.
Coordinate with construction schedule engineers for the schedule update and conduct weekly schedule review checking on total floats; logic analysis; and verify forecast completion dates.
Prepare internal monthly overall schedule analysis report to management highlighting the projects critical path; identifying near critical activities; delayed activities; provide schedule statistics and list down areas of concern.
Prepare the overall schedule status for the monthly report to client highlighting major schedule variances to the baseline.
Prepare the risk analysis and recovery schedule at 50% progress for the joint project management team’s Risk Analysis Workshop.
Gather and prepare the back up data as the basis for the recovery schedule such as construction productivity rates; offshore engineering forecast of AFC drawing issuance; and procurement forecast delivery dates.
Prepare the initial pre-commissioning / commissioning schedule based from data provided by the interim commissioning manager.
Take the lead in the preparation of the construction and pre-commissioning system-wise detailed schedule at 70% progress based from the P&ID and non-P&ID systems definition to achieve system-wise mechanical completion handover.
Update and maintain the EPC master schedule. Generate 3 week and 90 days look-ahead construction schedule for weekly and monthly project contractual submission..
Gather offshore engineering and procurement progress data for roll up into the master schedule.
Coordinate with discipline engineers and procurement coordinators on matters related to schedule.
Coordinate with construction schedule engineers for the schedule update and conduct weekly schedule review checking on total floats; logic analysis; and verify forecast completion dates.
Prepare internal monthly overall schedule analysis report to management highlighting the projects critical path; identifying near critical activities; delayed activities; provide schedule statistics and list down areas of concern.
Prepare the overall schedule status for the monthly report to client highlighting major schedule variances to the baseline.
Prepare the risk analysis and recovery schedule at 50% progress for the joint project management team’s Risk Analysis Workshop.
Gather and prepare the back up data as the basis for the recovery schedule such as construction productivity rates; offshore engineering forecast of AFC drawing issuance; and procurement forecast delivery dates.
Prepare the initial pre-commissioning / commissioning schedule based from data provided by the interim commissioning manager.
Take the lead in the preparation of the construction and pre-commissioning system-wise detailed schedule at 70% progress based from the P&ID and non-P&ID systems definition to achieve system-wise mechanical completion handover.