START Date:
May, 2007
END Date:
June, 2009 Responsibilities include Planning, Scheduling, Monitoring and Control of 800 MUS$ Oil & Gas EPC Project of 36 months which was being executed for Petroleum Development Oman (PDO). Approved by PDO as Sr. Planning Engineer for QAS Project, which is a key position as required by the Contract.
Project 2
Owner : Petroleum Development Oman
Industry : Oil & Gas
Project : Qarn Alam Steam Injection Project - Integrated Water Treatment (42,000 m3/Day), Steam Generation & Injection (18,000 TPD) and Oil & Gas Separation (60,000 BPD) - EPC Project of 36 months with contract value of over 800 MUSD.
Designation: Lead Planning Engineer (Approved by PDO as Key Personnel)
Job Description : Planning, Scheduling, Inter discipline Co-ordination, monitoring & control of whole EPC Project, Progress reporting, Schedule Update and Co-ordination with Client (PDO) & Engineering Sub-contractor (Mott MacDonald). Supervising a team of 5 Planning & Costing Engineers.
Project 2
Owner : Petroleum Development Oman
Industry : Oil & Gas
Project : Qarn Alam Steam Injection Project - Integrated Water Treatment (42,000 m3/Day), Steam Generation & Injection (18,000 TPD) and Oil & Gas Separation (60,000 BPD) - EPC Project of 36 months with contract value of over 800 MUSD.
Designation: Lead Planning Engineer (Approved by PDO as Key Personnel)
Job Description : Planning, Scheduling, Inter discipline Co-ordination, monitoring & control of whole EPC Project, Progress reporting, Schedule Update and Co-ordination with Client (PDO) & Engineering Sub-contractor (Mott MacDonald). Supervising a team of 5 Planning & Costing Engineers.