We are about to cost load a schedule. In the past I have done it both by budgeted cost on a resource and by expenses. This schedule will be tied to contract Manager to update the schedule of values, we are then paid by.
I am truely looking for an application (p6) preference that would provide the basic simplicitic results. P3 was simple in providing this. P6 has so many things to check and uncheck, the results become muddy and the fix is disasterous.
I need to know whether the expenses would be pulled into the Contract Manager in the way the Resources use to be pulled in with P3. Or should we load into the resources/roles and figure out how the 1000 fields calculate?
Has anybody even done this on a project that provide the results they were looking for?
I am truely looking for an application (p6) preference that would provide the basic simplicitic results. P3 was simple in providing this. P6 has so many things to check and uncheck, the results become muddy and the fix is disasterous.
I need to know whether the expenses would be pulled into the Contract Manager in the way the Resources use to be pulled in with P3. Or should we load into the resources/roles and figure out how the 1000 fields calculate?
Has anybody even done this on a project that provide the results they were looking for?