I have been in scheduling\planning for about 6 years, mainly vertical construction and I now wonder how my peer’s schedules look. What activities are typically included in other folks’ schedules? Specifically, pre-engineered metal buildings or standard construction.
I had to learn scheduling essentially on my own. I really have no real basis for comparison.
Not sure if this is appropriate, but could anyone email their more typical schedule for pre-engineered metal buildings or a more standard type construction is fine? I can import P3, P5 and P6 schedule formats. Hell, even a pdf would be cool.
Thank you in advance and my email is benjamin.mora@mapcoinc.net [1]
I had to learn scheduling essentially on my own. I really have no real basis for comparison.
Not sure if this is appropriate, but could anyone email their more typical schedule for pre-engineered metal buildings or a more standard type construction is fine? I can import P3, P5 and P6 schedule formats. Hell, even a pdf would be cool.
Thank you in advance and my email is benjamin.mora@mapcoinc.net [1]