So Im trying to import data into P6 via excel, but its not taking in the Original Duration correctly. Its putting the budgeted units in place, so I end up with 1 unit/time. (ie... 64hrs & 64 budgeted labor units).
Ive used this template plenty of times on other systems and it works. This is a fresh install, so are there some settings or something I should be concerned about. I compared my preferences side by side to the other systems and made sure they were the same.
Also, to troubleshoot, I deleted all of the BLUs in the excel file and left the OD in there. It then put the ODs in place of the BLUs. So who knows? Im assuming Im missing some setting somewhere.
Any clues?
Ive used this template plenty of times on other systems and it works. This is a fresh install, so are there some settings or something I should be concerned about. I compared my preferences side by side to the other systems and made sure they were the same.
Also, to troubleshoot, I deleted all of the BLUs in the excel file and left the OD in there. It then put the ODs in place of the BLUs. So who knows? Im assuming Im missing some setting somewhere.
Any clues?