hi,
Im trying to figure out, where is in the p6.1-db the "flag" or how is the relation done for the project baseline or the primary user baseline. I looked through the project table and relations and could not find how is the mapping done inside the db. Im trying to set up a report directly from the db 6.1
Any idea would be appreciated ;-)
Cheers
Georges-Louis
Im trying to figure out, where is in the p6.1-db the "flag" or how is the relation done for the project baseline or the primary user baseline. I looked through the project table and relations and could not find how is the mapping done inside the db. Im trying to set up a report directly from the db 6.1