Hi everyone,
I have a question in Primavera SureTrak. I have a SureTrak schedule, and I notice that the Data Date line does not fall directly under Week 1 (ordinal dates). It is located about a day or two later. Is there a way to fix this so that the Data Date line fall directly at the start of Week 1?
Thanks!
I have a question in Primavera SureTrak. I have a SureTrak schedule, and I notice that the Data Date line does not fall directly under Week 1 (ordinal dates). It is located about a day or two later. Is there a way to fix this so that the Data Date line fall directly at the start of Week 1?
Thanks!