Dear All,
Were trying to upgrade P5 to P6 using the same database. Projects are okey, nothing has changed; but the problem is, when i try to look for the default resources(manpower,materials,costs,etc..) as we used in P5 before, not all resources are available in P6 after configuration.. Is there something something wrong with the process or the software itself cant handle all datas from P5 to P6..
Could anyone help me please...
Tnx so much in advance...
Were trying to upgrade P5 to P6 using the same database. Projects are okey, nothing has changed; but the problem is, when i try to look for the default resources(manpower,materials,costs,etc..) as we used in P5 before, not all resources are available in P6 after configuration.. Is there something something wrong with the process or the software itself cant handle all datas from P5 to P6..