Someone is changing the calendars (from 7 days to 5 days). And its frustrating because all my floats are changing.
However since I am updatin my project, how do I avoid the changes in the calendar.
If i use "project" calendar, I need to change the calendar foe each activity, one by one. is this the case?
Please advise. Thanks.