Currently using p3e and next year will need to develop and maintain an integrated programme made up of 5 or 6 plans provided by various contractors.
3 of them will be in p3e the others will probably be a mix of primavera and mpp
What tips can you provide in ensuring that integrating the plans into 1 will go as smoothly as possible.
One of the issues I encountered last time included the settings used by some of the contractors when scheduling their plan. (1 had it set to predecessors calander and the other had it set to successor calendar which caused problems when merging the programmes together in one)
3 of them will be in p3e the others will probably be a mix of primavera and mpp
What tips can you provide in ensuring that integrating the plans into 1 will go as smoothly as possible.
One of the issues I encountered last time included the settings used by some of the contractors when scheduling their plan. (1 had it set to predecessors calander and the other had it set to successor calendar which caused problems when merging the programmes together in one)