Hi all,
I have two schedules in P3. In one, I can click on an Activity ID then edit it to change the number.
In the other, the Activity IDs are greyed out when I select them and I am not able to edit them.
Any ideas on how I can set up the second schedule so that I can edit Activity IDs?
Thanks a lot.
I have two schedules in P3. In one, I can click on an Activity ID then edit it to change the number.
In the other, the Activity IDs are greyed out when I select them and I am not able to edit them.
Any ideas on how I can set up the second schedule so that I can edit Activity IDs?
Thanks a lot.