I have some questions concerning fast using of p3e
- is there a shortcut for linking (not the right mousebutton -too slow!)
- can I just type a new activity-code-value in my activity view as I used to to in P3.1? (P3.1 then puts the value in the right list)
- if I have a long list with hyrarchic Activity-code- values must I browse down every time I want to assign one of the values at the bottom of this list? (colapsed list are uncolapsed every time I want to make a new assignment)
for a huge timeschedule a lot of time gets lost for unneccesary steps!
- is there a shortcut for linking (not the right mousebutton -too slow!)
- can I just type a new activity-code-value in my activity view as I used to to in P3.1? (P3.1 then puts the value in the right list)
- if I have a long list with hyrarchic Activity-code- values must I browse down every time I want to assign one of the values at the bottom of this list? (colapsed list are uncolapsed every time I want to make a new assignment)
for a huge timeschedule a lot of time gets lost for unneccesary steps!