I have to add verious resouces to around 1000 activities. It was possible in P3 to assign resouces applying the feature of Global Change within seconds. But assigning resouces to activities one by one is too labourious. Is there any option in P6 to add resouces applying Global change?
If anybody has the idea, please list down the steps for the same using P6.
Aman