Hi,
Can someone explain this production rate.Can i use this as reference for scaffolding erection
Ref Task / Description Slow Ave Fast Units
337 Metal KwikStage, 5 Boards with 2m lifts 11.1 11.9 12.5 m run/hr
338 Metal KwikStage, 5 Boards with 3m lifts 9.1 10.0 10.5 m run/hr
339 Metal KwikStage, House Scaffold with 3 lifts 2.8 3.2 3.8 m run/hr
340 Metal Tube and Fittings, 5-6 Boards wide 3.2 3.7 4.6 m run/hr
regards,
kier