Can anyone please help me with information regarding slipforming productivity rates.
If i am slipforming a lift core how many mts can i achieve per day (this would include the rebar fixing, shuttering for the boxouts/leaveouts, concreting and Slipping the form). Can i continue the slipforming operation without stoppages that is as continous operation?
In the case that it can be done without stoppages how many days would it take to slipform 115m ?