Hi
Im using Powerproject 9. I have formatted the Bar Chart so that Saturday and Sunday are displayed with the weekend green shading and tasks are, by default, not scheduled to be worked on during these 2 days.
Its all fine except that at the end of each half day there is a thick vertical green. This can be confusing as it intially appears that there are 4 non-working/weekend days blocked out. Is there any way you can stop that vertical line appearing at the end of the half day, without having to adjust the working time settings.
Thanks, Laurie
Im using Powerproject 9. I have formatted the Bar Chart so that Saturday and Sunday are displayed with the weekend green shading and tasks are, by default, not scheduled to be worked on during these 2 days.
Its all fine except that at the end of each half day there is a thick vertical green. This can be confusing as it intially appears that there are 4 non-working/weekend days blocked out. Is there any way you can stop that vertical line appearing at the end of the half day, without having to adjust the working time settings.
Thanks, Laurie