Hi Guys, could do with a bit of advice.
Im developing a schedule at the moment where the principal constraint is volume of water available.
I have tried to set up the water availability as a material resource, but cant figure out how to change the volume available within a calendar (such that I can have more availability as time goes on)and then use this to level the schedule.
Im sure that Ive missed something very obvious! Can anyone offer any help and put me out of my misery?
Many Thanks
Chris
Im developing a schedule at the moment where the principal constraint is volume of water available.
I have tried to set up the water availability as a material resource, but cant figure out how to change the volume available within a calendar (such that I can have more availability as time goes on)and then use this to level the schedule.
Im sure that Ive missed something very obvious! Can anyone offer any help and put me out of my misery?
Many Thanks
Chris