Hello,
I am copying an enterprise structure which has 3 projects in it. When I copy these the enterprise codes dont copy over and you are left with the projects each having project codes. Am I missing something ?
Keep Planning,
Kevin.
I am copying an enterprise structure which has 3 projects in it. When I copy these the enterprise codes dont copy over and you are left with the projects each having project codes. Am I missing something ?
Keep Planning,
Kevin.