sir,
for typical floors take 52 floors once we copy activities n fragnet links r there but after retreving if one of links needs to b changed is there any other way to do tht for all 52 floors by global change or something.
Also if i want to insert/merge activities (wth links) in revised progg. how should tht be done.
for typical floors take 52 floors once we copy activities n fragnet links r there but after retreving if one of links needs to b changed is there any other way to do tht for all 52 floors by global change or something.
Also if i want to insert/merge activities (wth links) in revised progg. how should tht be done.