Hello all planners,
I have my experience in Oil and Gas Industries I have been assigned as a planner for high rise building (over 50 floors), appreciate if any can give me some key points to look for when building the schedule.
Also knowing the area of the building and the cycle for each floor (which is 6 days for each floor) how can I calculate the number of tower cranes and stationary concrete pumps required to meet the target dates?
I have my experience in Oil and Gas Industries I have been assigned as a planner for high rise building (over 50 floors), appreciate if any can give me some key points to look for when building the schedule.
Also knowing the area of the building and the cycle for each floor (which is 6 days for each floor) how can I calculate the number of tower cranes and stationary concrete pumps required to meet the target dates?