Hi,
How can I copy the Project Codes to Global Codes?Is there
a utility provided with P3e?
Regards
Azad
How can I copy the Project Codes to Global Codes?Is there
a utility provided with P3e?
Regards
Azad
Links:
[1] http://www.planningplanet.com/forums/oracle-primavera-pm6