I am fairly new to P3e/c.
I would like to know if there is a way, like the P3 Version 3.1, in which you could assign a cost account to track budgeted cost, actual this period and actual to date on P3 e/c.
Do I have to asssign a resource so I could track cost on P3 e/c?
Thanks for your help.