Hi
I want to transfer a P3 project with area, item , responsibility i.e with heads and sub heads as it is made in P3 to excel.
plz lay down the procedure that I get the true copy of schedule in excel as I made in P3
thanks
I want to transfer a P3 project with area, item , responsibility i.e with heads and sub heads as it is made in P3 to excel.
plz lay down the procedure that I get the true copy of schedule in excel as I made in P3
thanks