Hi,
Im looking for several stories actually. Im working with several Petro Chemical Companies in Europe as a consultant and Master Scheduler. All these companies are workign with P3, and mostly using it for routine/daily maintenace. P3 seems to fit in with all of them, only the activity id length (which we seem to find a work around for each time) and the number of activity codes seem to be a slight problem sometimes.
I would like to hear/read stories about other consultants/schedulers/planners using P3e/c for routine/daily maintenance in the same industry as Im working in.
Im looking for several stories actually. Im working with several Petro Chemical Companies in Europe as a consultant and Master Scheduler. All these companies are workign with P3, and mostly using it for routine/daily maintenace. P3 seems to fit in with all of them, only the activity id length (which we seem to find a work around for each time) and the number of activity codes seem to be a slight problem sometimes.
I would like to hear/read stories about other consultants/schedulers/planners using P3e/c for routine/daily maintenance in the same industry as Im working in.