Does anybody know how to create workload in P3e (like dia-in piping weld, m3 concrete pouring, M1 cable installation, ect).
I dont understand why P3e v 3.51 categorize material as "expenses" (inderect cost), whereas there is many direct material that relevant with workload.
I dont understand why P3e v 3.51 categorize material as "expenses" (inderect cost), whereas there is many direct material that relevant with workload.