Hello expert out there can somebody share their knowledge about a Operational parameter or production rate:
tHis is the case :
This is a site preparation work the area is very wide no obstruction the scope is to develope the area:
What I want to know is Production rate for Excavation and filling to require level wherein Qty to be excavated = Qty to fill: Given Qty = 9,723,436 cubic meter,
Want to know estimated Manhour / Mandays and Equipment hour.
Need some help
Best regards,