Hi there,
I wanted to know if we can perform what if analysis in P3 program.
Example:
I have built a program in P3 for a project it is cost 6million KD.
now we are in the first floor Cast roof and columns, and the first roof it supposed to be completed say in 31Mar2002.
the question know what if I finish the first roof in 30Apr2002.
what will be the schedule looks like, or what is the effects(in progress,Cost to complet,..etc.).
How we can perform this analysis?
Answer from Profesionals only would be apreciated.
thanks
Ali
-----------------------------
I wanted to know if we can perform what if analysis in P3 program.
Example:
I have built a program in P3 for a project it is cost 6million KD.
now we are in the first floor Cast roof and columns, and the first roof it supposed to be completed say in 31Mar2002.
the question know what if I finish the first roof in 30Apr2002.
what will be the schedule looks like, or what is the effects(in progress,Cost to complet,..etc.).
How we can perform this analysis?
Answer from Profesionals only would be apreciated.
thanks
Ali
-----------------------------