The current BIM tools need a schedule and most can import a P6 file. Future developments will remove the need for a separate sceduling tool, the way the project is built wil become integral to the 4D model: https://mosaicprojects.com.au/PMKI-ITC-011.php
Member for
12 years 6 monthsProgress in those fronts have
Progress in those fronts have been very slow historically in AEC.
Member for
24 years 9 monthsThe current BIM tools need a
The current BIM tools need a schedule and most can import a P6 file. Future developments will remove the need for a separate sceduling tool, the way the project is built wil become integral to the 4D model: https://mosaicprojects.com.au/PMKI-ITC-011.php