I have 2 projects open with 2 different data dates.

Member for

12 years 6 months

I think the issue must have something to do with the Calendar "days" actually being hours -  the cal. came from a contractor so not yet about it, but I sustpect.  My 256 days slid 6 months does not match the dates of these 256 days later - per outside checks...

Member for

12 years 6 months

I think the issue must have something to do with the Calendar "days" actually being hours -  the cal. came from a contractor so not yet about it, but I sustpect.  My 256 days slid 6 months does not match the dates of these 256 days later - per outside checks...

Member for

12 years 6 months